Capabilities

Super Power

97% of UK power faults occur in the distribution network. The NGD Data Centre has its own dedicated sub-station with direct connection to the 400kV Super Grid, effectively by-passing the electricity distribution network. . No other UK Data Centre has this.NGD’s 180MW ultimate capacity – enough to power a city - means that, unlike many other UK Data Centres which are power limited, NGD always has power on tap and can support rising compute densities.

power-01

All NGD’s power comes from renewable sources, meaning that you can benefit from cheaper, cleaner and more reliable power. Being Tier 3+, we have comprehensive UPS, backup generation and fully redundant power distribution from the Super Grid to each Data Hall. We can concurrently maintain all elements of plant. To date, we’ve not encountered a power specification we could not deliver.